info@innov8-group.co.uk Ring us: 0333 335 6375
Not sure which service you need? Ask us, it's free
REQUEST A CALL BACK
innov8 Group
01About 02Services 03Costs 04Projects 05News 06Locations 07Contact INSTANT QUOTE
SERVICES · ASBESTOS SERVICES FOR CONSTRUCTION

Main Contractors.

Refurbishment and demolition contractors rely on us for R&D surveys, licensed removal and soft strip that never holds up the programme, one accountable subcontractor with RAMS, notifications and clearances handled end to end.
GET A FIXED QUOTE 0333 335 6375
WHERE WE WORK

The buildings we work in

Refurbishment and demolition packages, pre-strip enabling works, structural alterations and full site clearances — if your project touches a building finished before 2000, a refurbishment and demolition survey and a licensed removal package usually sit on the critical path.
We price from the survey, submit RAMS and notifications up front, and hold your programme: directly employed operatives, enclosures built to the plan of work, air testing booked ahead, and a four-stage clearance that does not become your delay.
WHAT WE FIND

Asbestos materials we find here

The materials that most often appear in refurb and demolition packages — tap through for method and cost guides you can drop into a tender.
01
AIB throughout structures
Read the guide →
02
Sprayed structural coatings
Read the guide →
03
Pipe lagging
Read the guide →
04
Cement roofs & cladding
Read the guide →
05
Contaminated made ground
Read the guide →
06
Floor tiles & bitumen
Read the guide →
07
Gaskets & fuse boards
Read the guide →
08
Fire doors & AIB
Read the guide →

An enabling trade that hits the programme

When asbestos turns up on a refurbishment or demolition job, everything behind it stops. Our job is to unblock yours: fast mobilisation, refurbishment & demolition surveys before the strip-out, licensed and non-licensed removal sequenced to your programme, and soft strip delivered by the same team so you’re not coordinating two contractors in one zone. HSE notification, RAMS and permits are handled by us and issued to you before we arrive.
We’re used to being one trade among many. Our supervisors coordinate with your site management on inductions, shared welfare, crane and hoist slots and sectional handbacks, and our enclosures are built to let surrounding trades keep working. Unexpected finds are quoted and notified fast — 14-day HSE notice periods are factored into the programme honestly rather than discovered late. For pricing structures on larger packages see our commercial asbestos removal service.

Handover documentation, first time

Every package closes with the paperwork your O&M manual and client need: survey reports, notifications, air monitoring data, four-stage clearance certificates and waste consignment notes, issued as a single indexed pack. No chasing documents at practical completion.

An enabling trade that protects your programme

Asbestos is the trade that can stall every other trade, so we run it like an enabling package: refurbishment and demolition survey information reviewed before we price, HSE 14-day notification lodged the day the order lands, and mobilisation dates you can plan RAMS and inductions around. On site we coordinate through your management team, phase enclosures so following trades keep moving, and hand over each area with the analyst's four-stage clearance certificate — the document your client's team actually asks for at handover.

Paperwork built for the O&M file

Every project closes with a completion pack: plan of work, notification, clearance certificates, waste consignment notes and drawings marking what was removed and what remains. Unexpected finds mid-programme get same-week sampling and a quotation within 24 hours, because we know what a stopped floor costs. We also carry out the soft strip itself where that helps the programme.
RELEVANT SERVICES
R&D surveys →
Licensed removal →
Soft strip →
Structural demolition →
FREQUENTLY ASKED

Main contractor questions, answered

01How quickly can you mobilise to site?
For non-notifiable work, often within days. Notifiable licensed work legally requires 14 days’ notice to the HSE — we submit the notification immediately on instruction and use the notice period for enclosure design, RAMS and inductions so removal starts the day the clock expires.
02Do you carry out refurbishment & demolition surveys?
Yes. R&D surveys are the legal prerequisite for any refurbishment or demolition work, and we run them tightly ahead of your strip-out so findings feed straight into the removal package rather than arriving as a surprise mid-programme.
03Can you work to our programme and alongside other trades?
Yes — it’s most of what we do. Sealed enclosures let adjacent zones keep working, we attend your coordination meetings, and we hand back areas sectionally so following trades start early where possible. Out-of-hours and weekend shifts are available when the programme needs them.
04What insurance and accreditations do you hold?
Full HSE asbestos removal licence (No. 242606081), £10m public and employer’s liability insurance, and CHAS, SafeContractor and Constructionline Gold accreditations. Licence and insurance documents are issued with every tender pack.
05Do you handle HSE notification?
Yes — ASB5 notification and the 14-day notice period are managed by us, with licence conditions, plans of work and waste routes all in place before the programme date.
06Can you price from a bill or survey?
Either — we quote from your R&D survey or BoQ, flag where provisional sums carry risk, and requote quickly on discovery items so commercial teams are never guessing.
07What happens if more asbestos is found mid-strip?
Stop, report, evidence — photographs and survey data with a priced variation the same week. No buried extras, no surprise final account.
08Do you provide supervision and daily reporting?
A supervisor per enclosure, daily site records, smoke tests and clearance documentation — an audit trail your CDM and quality teams can lift straight into the H&S file.
09Will your site standards match ours?
Inductions, your PPE and permit rules, tidy compounds and hoarding lines respected — we behave like part of your site team, not visitors to it.
10Can you deliver soft strip alongside removal?
Yes — combined licensed removal and soft strip packages under one mobilisation, one RAMS pack and one point of contact, which usually saves programme and prelims.
RECENT WORK

Projects in this sector

Enabling and strip-out packages delivered for main contractors — scoped, notified and cleared to programme.
Soft strip, demolition & asbestos cement roof removal at Falcon Works
DEMOLITION & SOFT STRIP · FALCON WORKS, LOUGHBOROUGH · LE11
Soft strip, demolition & asbestos cement roof removal at Falcon Works
View case study →
AIB & non-licensed removal at the Jarvis Building
COMMERCIAL · JARVIS BUILDING, DONCASTER · DN1
AIB & non-licensed removal at the Jarvis Building
View case study →
Asbestos garage removal at New Street, Altrincham
RESIDENTIAL · NEW STREET, ALTRINCHAM · WA14
Asbestos garage removal at New Street, Altrincham
View case study →
See all case studies →
WHY INNOV8

Licensed, audited and insured

HSE licensed
Full HSE licence No. 242606081 for the highest-risk asbestos work
Independently audited
CHAS, SafeContractor & Constructionline Gold accredited
Vetted teams
DBS-checked, medically screened, face-fit tested operatives
Paperwork included
Consignment notes & clearance certificates on every job
chassafecontractorconstructionlineasesaenvironment agencylivingwagedbshiscoxsafepqqbsc
chassafecontractorconstructionlineasesaenvironment agencylivingwagedbshiscoxsafepqqbsc
CONTACT US

Talk to a specialist today

CALL US NOW
0333 335 6375
Mon to Fri 8am to 6pm · Emergencies day & night
Tap to call
EMAIL US
info@innov8-group.co.uk
Attach photos for a faster quote
Send an email
CALL BACK
We ring you back the same working day
Leave your number, we do the chasing
Arrange a call
QUOTATION FORM
Fixed written quote within 24 hours
Send the details and photos
Start your quote
Innov8 Group
HSE-licensed asbestos removal and environmental contractor. Surveys, removal, demolition, remediation and hazardous waste — one team, one responsibility. North West based, working UK-wide.
Follow us on social media
PAGES
About usServicesCostsProjectsNewsLocationsAccreditationsFAQsSurvey analyserContact
SECTORS
HomeownersLandlordsHousing associationsSchoolsHealthcareMain contractorsIndustrialRetail & officesPublic sectorDevelopers & land remediation
CONTACT
0333 335 6375 info@innov8-group.co.uk Unit 7, Wilsons Business Park Centre, Manchester M40 8WN
website by pixelmonster
5-star rated by our customers
5-star rated on Trustpilot reviews
5-star rated on Yell business reviews
Verified reviews across the web
Trustindex© 2026 Innov8 UK Group Ltd. All rights reserved.  ·  Privacy  ·  Cookies
website by pixelmonster