Expect the room to be out of use for the duration of the work and a clean-up period afterwards. Furniture and fittings need to be cleared, and adjoining rooms may need protecting where doors are open. Most domestic rooms are completed in a day; large or multi-room commercial floors are programmed in phases.
Removal leaves a bare substrate, often with adhesive residue or a sealed stain. Screed repairs, levelling compound and the new floor finish are separate trades and are included only where they are listed in the quotation. Agree in advance who is responsible for reinstatement.
What affects the price: floor area, how well the tiles are bonded, whether the adhesive also has to come up, access and clearing of the room, the number of rooms and the work category confirmed by the assessment (non-licensed, notifiable non-licensed or licensed). Small areas carry a minimum charge because the setup and disposal apply however little material there is. See our
asbestos removal cost guide for current guide rates.