CASE STUDY · RESIDENTIAL · WIGAN · WN1

AIB garage ceiling panel removal, Walter Scott Avenue

A completed Innov8 UK Group project in Wigan — delivered safely, documented fully and handed back on programme.
THE PROJECT

What we did

AIB garage ceiling panels removed under full licensed conditions, with enclosure, environmental clean and air monitoring throughout. The garage was independently cleared before handback, with the complete document pack supplied.

Work areas were zoned and cleaned methodically with HEPA extraction and appropriate RPE, keeping the surrounding operations running throughout, and closed out with photographic records and full waste documentation.

Innov8 UK Group carries out industrial cleaning and asbestos removal in Wigan and across the UK, with depots in Manchester, Carlisle and London. Every project — from a single garage to live rail and industrial sites — gets the same controls, the same paperwork and the same honest advice.

Project at a glance
Sector: RESIDENTIAL · WIGAN · WN1
Location: Wigan
Scope: AIB garage ceiling
Outcome: Completed, cleared and fully documented
GET A QUOTE FOR A SIMILAR JOB ← ALL PROJECTS
FROM THE PROJECT RAMS

Scope of works & method

OVERVIEW AND JUSTIFICATION FOR THE WORKS

Our contracts manager attended site on the agreed date at 10:00am, accompanied by the client’s representative.

A walkthrough of the garage and associated property was carried out. Following the inspection, the client confirmed their intention to proceed with asbestos removal works under fully controlled conditions.

The asbestos-containing material identified comprises asbestos insulating board (AIB) panels, which are nailed to timber joists. The total estimated quantity is approximately 10m². No visible voids were identified leading into other areas of the property. The only anticipated void is located above the AIB panels, with an estimated depth of approximately 150mm.

The asbestos is currently in very good condition in situ.

The garage door was removed by the client prior to commencement of works. The main fixing bracket remained attached to the AIB panels and was removed by IUG as part of the works. This was disposed of accordingly, as the client has confirmed that a replacement garage door was not reinstated.

HOW THE ASBESTOS AND NON-ASBESTOS RISKS WERE CONTROLLED

Asbestos risks were controlled through fully licensed removal within a purpose-built enclosure maintained under negative pressure, using controlled wet-removal techniques, shadow vacuuming, strict decontamination procedures, and independent UKAS-accredited air monitoring in accordance with CAR 2012, HSG247, and IUG procedures’-asbestos risks, including work at height and use of access equipment, was managed through site-specific risk assessments, competent supervision, compliant use and inspection of step ladders and hop-ups, clear segregation, and appropriate PPE.

OBSTRUCTIONS MAKING ACCESS AND THE WORKS MORE DIFFICULT?

The client ensured the garage is completely emptied prior to works commencing, with no obstructions that may hinder access or removal activities.

SAMPLES AVAILABLE FOR SITE/REF

Yes, sample results confirming Amosite/Chrysotile insulating board

ANY ASBESTOS TO BE LEFT IN SITU?

No asbestos materials within this scope of works to be left in situ.

ON SITE

Photos from the project

AIB garage ceiling panel removal, Walter Scott Avenue — on-site photo 1 — Innov8 UK Group
AIB garage ceiling panel removal, Walter Scott Avenue — on-site photo 2 — Innov8 UK Group
AIB garage ceiling panel removal, Walter Scott Avenue — on-site photo 3 — Innov8 UK Group
RELATED PROJECTS
RESIDENTIAL · BISPHAM, WIGAN · WN8
AIB garage ceiling panel removal, Robin Lane
View case study →
EDUCATION · WEST DERBY, LIVERPOOL · L12
AIB ceiling removal at St Mary’s West Derby Primary
View case study →
COMMUNITY & LEISURE · SOUTHPORT · PR9
200m² AIB function room ceiling removal at St Patrick’s Social Club
View case study →
RELATED:HSE licensed asbestos removal →  ·  All projects →
Innov8 Group
HSE-licensed asbestos removal and environmental contractor. Surveys, removal, demolition, remediation and hazardous waste — one team, one responsibility. North West based, working UK-wide.
Follow us on social media
PAGES
About usServicesCostsProjectsNewsLocationsAccreditationsFAQsSurvey analyserContact
SECTORS
HomeownersLandlordsHousing associationsSchoolsHealthcareMain contractorsIndustrialRetail & officesPublic sectorDevelopers & land remediation
CONTACT
0333 335 6375 info@innov8-group.co.uk Unit 7, Wilsons Business Park Centre, Manchester M40 8WN
website by pixelmonster
5-star rated by our customers
5-star rated on Trustpilot reviews
5-star rated on Yell business reviews
Verified reviews across the web
Trustindex© 2026 Innov8 UK Group Ltd. All rights reserved.  ·  Privacy  ·  Cookies
website by pixelmonster