CASE STUDY · EDUCATION · WEST DERBY, LIVERPOOL · L12

AIB ceiling removal at St Mary’s West Derby Primary

A completed Innov8 UK Group project in Liverpool — delivered safely, documented fully and handed back on programme.
THE PROJECT

What we did

10m² licensed AIB ceiling removal delivered inside the school holidays, with the head teacher informed at every stage. The classroom was handed back cleared, certified and ready for the first day of the new term.

The removal sequence was planned to keep the rest of the building unaffected — protected transit routes, a controlled enclosure with negative pressure, hygiene facilities on site and every waste movement consignment-noted to a licensed facility.

Innov8 UK Group carries out licensed asbestos removal and asbestos removal in Liverpool and across the UK, with depots in Manchester, Carlisle and London. Every project — from a single garage to live rail and industrial sites — gets the same controls, the same paperwork and the same honest advice.

Project at a glance
Sector: EDUCATION · WEST DERBY, LIVERPOOL · L12
Location: Liverpool
Scope: AIB ceiling · 10m²
Outcome: Completed, cleared and fully documented
GET A QUOTE FOR A SIMILAR JOB ← ALL PROJECTS
FROM THE PROJECT RAMS

Scope of works & method

Overview of project and why the works are required

Following a recent enquiry from an independent surveying company Northwest, IUG were requested to attend St Mary’s West Derby CE Primary School on the agreed date to carry out a site visit in relation to licensed asbestos materials requiring removal to facilitate upcoming refurbishment works within the boiler room and associated service areas.

In attendance were representatives from RB Mechanical Services (fit-out contractors) and the school caretaker. During the inspection, an asbestos insulating board (AIB) ceiling measuring approximately 10m² was identified within the external standalone boiler room. No asbestos debris is present, allowing safe entry and a thorough inspection of the room. A scope of works was agreed on-site, and the client confirmed IUG to proceed with the removal at the earliest opportunity.

The asbestos removal works commenced on the agreed date and are expected to take three days to complete. This programme ensures that all asbestos materials were fully removed before the return of pupils on the agreed date, enabling RB Mechanical Services to undertake their refurbishment works immediately afterwards.

The AIB removal was carried out under fully controlled conditions, within a purpose-built enclosure operating under negative pressure. The premises remained unoccupied during the works, other than periodic caretaker visits (with attendance available on a call-out basis, (approximately 10 minutes from site). All works were conducted in full compliance with the Control of Asbestos Regulations 2012.

HOW THE ASBESTOS AND NON-ASBESTOS RISKS WERE CONTROLLED

Licensed asbestos removal was carried out under fully controlled conditions.

Manual Handling Risks – Handling sheeting, timber, and equipment in confined areas lifting and positioning NPUs, vacuums, and non-asbestos waste. Slips, Trips, and Falls – Steps to the boiler room, pipework obstructions, and restricted movement from cables, boilers, or equipment. Noise & Vibration – Use of power tool Milwaukee Combi Drill - MILM18FPD3 for enclosure construction, the loudest equipment on site being utilised was the negative

ON SITE

Photos from the project

AIB ceiling removal at St Mary’s West Derby Primary — on-site photo 1 — Innov8 UK Group
AIB ceiling removal at St Mary’s West Derby Primary — on-site photo 2 — Innov8 UK Group
AIB ceiling removal at St Mary’s West Derby Primary — on-site photo 3 — Innov8 UK Group
AIB ceiling removal at St Mary’s West Derby Primary — on-site photo 4 — Innov8 UK Group
AIB ceiling removal at St Mary’s West Derby Primary — on-site photo 5 — Innov8 UK Group
AIB ceiling removal at St Mary’s West Derby Primary — on-site photo 6 — Innov8 UK Group
RELATED PROJECTS
CARE & HEALTHCARE · CROSBY, LIVERPOOL · L23
Licensed asbestos removal across plant & basement areas at Nazareth House
View case study →
COMMUNITY & LEISURE · SOUTHPORT · PR9
200m² AIB function room ceiling removal at St Patrick’s Social Club
View case study →
RESIDENTIAL · BISPHAM, WIGAN · WN8
AIB garage ceiling panel removal, Robin Lane
View case study →
RELATED:Asbestos removal in Liverpool →  ·  HSE licensed asbestos removal →  ·  All projects →
Innov8 Group
HSE-licensed asbestos removal and environmental contractor. Surveys, removal, demolition, remediation and hazardous waste — one team, one responsibility. North West based, working UK-wide.
Follow us on social media
PAGES
About usServicesCostsProjectsNewsLocationsAccreditationsFAQsSurvey analyserContact
SECTORS
HomeownersLandlordsHousing associationsSchoolsHealthcareMain contractorsIndustrialRetail & officesPublic sectorDevelopers & land remediation
CONTACT
0333 335 6375 info@innov8-group.co.uk Unit 7, Wilsons Business Park Centre, Manchester M40 8WN
website by pixelmonster
5-star rated by our customers
5-star rated on Trustpilot reviews
5-star rated on Yell business reviews
Verified reviews across the web
Trustindex© 2026 Innov8 UK Group Ltd. All rights reserved.  ·  Privacy  ·  Cookies
website by pixelmonster