CASE STUDY · EDUCATION · WARRINGTON · WA4

Licensed thermal pipe insulation removal at Cardinal Newman High School

A completed Innov8 UK Group project in Warrington. Site photography below runs from the enclosure build and duct works through to the corridors handed back for the new term.
THE PROJECT

What we did

Innov8 UK Group delivered the licensed removal of approx. 140 linear metres of chrysotile and amosite pipe thermal insulation from the underground duct beneath B Block at Cardinal Newman High School, Warrington (WA4). The duct runs approx. 71 metres along the main corridor with an 8-metre offshoot and is just 1 metre high, classifying the works as a confined space under the Confined Spaces Regulations 1997.

The insulation — wrapped in felt and wire mesh and in good-to-fair condition — was removed under fully controlled negative-pressure conditions during the school summer holidays, with the building vacant throughout to keep disruption to nil. Background air monitoring confirmed no fibres present, permitting half-face RPE during set-up and non-licensed preparation works.

For licensed asbestos removal or asbestos removal in Warrington, Innov8 UK Group works UK-wide from bases in Manchester, Carlisle and London — surveyed properly, quoted fixed and documented fully.

Project at a glance
Sector: Education · Warrington · WA4
Location: Warrington
Scope: Licensed pipe insulation removal (approx. 140 linear metres)
Outcome: Complete — four-stage clearance passed, summer 2026
GET A QUOTE FOR A SIMILAR JOB ← ALL PROJECTS
FROM THE PROJECT RAMS

Scope of works & method

Overview and justification for the works

A site assessment confirmed approx. 140 linear metres of chrysotile/amosite pipe thermal insulation within the underground duct beneath B Block, wrapped in felt and wire mesh and in good-to-fair condition, running approx. 71 metres along the main corridor with an 8-metre offshoot. Licensed removal was carried out during the school summer holidays under fully controlled negative-pressure conditions.

How the asbestos and non-asbestos risks are controlled

Asbestos risks were controlled through negative-pressure access enclosures at each duct hatch, wet-injection removal (BS 8520), Class H shadow vacuuming and decontamination in accordance with CAR 2012. As the duct is a confined space, a permit-to-work was in operation throughout, with a tripod and 45-metre winch at the mid-corridor hatch for emergency extraction and operatives using wheeled bogeys within the 1-metre-high duct. The negative pressure unit sits at the clean-corridor hatch, with a roving head running into the duct to an IUG-erected false wall at the far end of the ACM zone.

Obstructions and site conditions

The underground duct presents significant access restrictions — only 1 metre high throughout, with a confined atmosphere requiring continuous atmospheric monitoring. Standing water from earlier ingress was wet-vacuumed before removal began, flaking wall paint was scraped back, and festoon lighting was installed along the full length of the duct. All voids and penetrations were sealed before enclosure integrity testing, and the non-ACM insulated pipe runs on the opposite bank were also removed as part of the scope.

Waste & handover

Asbestos waste ran via the principal bag-lock hatch directly to the Heras-fenced compound, DCU and skip, and was consignment-noted for disposal at a licensed facility. The works completed with independent four-stage clearance and a full documentation pack issued to the client.

ON SITE

Photos from the project

Cardinal Newman High School — enclosure viewing panels along the corridor — Innov8 UK Group
Cardinal Newman High School — three-stage airlock built in the school corridor — Innov8 UK Group
Cardinal Newman High School — winch tripod rigged over the floor hatch inside the enclosure — Innov8 UK Group
Cardinal Newman High School — corridor sealed with polythene ahead of the works — Innov8 UK Group
Cardinal Newman High School — pedestrian segregation barriers and safety signage — Innov8 UK Group
Cardinal Newman High School — viewing panel and emergency winch system — Innov8 UK Group
Cardinal Newman High School — enclosure wall with viewing panels and warning signage — Innov8 UK Group
Cardinal Newman High School — airlock entrance into the live enclosure — Innov8 UK Group
Cardinal Newman High School — Innov8 van and decontamination unit on site — Innov8 UK Group
Cardinal Newman High School — asbestos pipe insulation in felt and wire-mesh wrap inside the duct before removal — Innov8 UK Group
Cardinal Newman High School — lagged pipework and flange joint in the underground duct before the works — Innov8 UK Group
Cardinal Newman High School — pipe runs along both banks of the 1-metre-high duct before removal — Innov8 UK Group
Cardinal Newman High School — inside the duct during the works with festoon lighting rigged — Innov8 UK Group
Cardinal Newman High School — duct mid-removal with task lighting and winch line in place — Innov8 UK Group
Cardinal Newman High School — duct after removal with the pipework stripped bare — Innov8 UK Group
Cardinal Newman High School — corridor floor hatch during reinstatement — Innov8 UK Group
Cardinal Newman High School — B Block corridor cleaned and handed back after clearance — Innov8 UK Group
Cardinal Newman High School — main corridor reinstated ready for the new term — Innov8 UK Group
RELATED PROJECTS
COMMERCIAL · HESKETH HOUSE, WARRINGTON · WA5
AIB removal at Hesketh House, Liverpool Road
View case study →
RAIL & INFRASTRUCTURE · LEEDS STATION, LEEDS · LS1
Environmental clean at Leeds Station, Dark Neville Street
View case study →
RAIL & INFRASTRUCTURE · RETFORD TRAIN STATION · DN22
AIB debris removal at Retford Train Station
View case study →
RELATED:HSE licensed asbestos removal →  ·  All projects →
Innov8 Group
HSE-licensed asbestos removal and environmental contractor. Surveys, removal, demolition, remediation and hazardous waste — one team, one responsibility. North West based, working UK-wide.
Follow us on social media
PAGES
About usServicesCostsProjectsNewsLocationsAccreditationsFAQsSurvey analyserContact
SECTORS
HomeownersLandlordsHousing associationsSchoolsHealthcareMain contractorsIndustrialRetail & officesPublic sectorDevelopers & land remediation
CONTACT
0333 335 6375 info@innov8-group.co.uk Unit 7, Wilsons Business Park Centre, Manchester M40 8WN
website by pixelmonster
5-star rated by our customers
5-star rated on Trustpilot reviews
5-star rated on Yell business reviews
Verified reviews across the web
Trustindex© 2026 Innov8 UK Group Ltd. All rights reserved.  ·  Privacy  ·  Cookies
website by pixelmonster