Approx. 20m² of Asbestos Insulating Board (AIB) ceiling was removed from a domestic property in Carlisle under fully licensed conditions, within a negative pressure enclosure with airlock decontamination procedures.
The enclosure was smoke-tested before work began, the ceiling removed using controlled wet techniques, and the area handed back only after a satisfactory independent four-stage clearance and issue of the certificate of reoccupation.
Innov8 UK Group provides licensed asbestos removal and asbestos removal in Carlisle for homeowners, businesses and main contractors alike, working UK-wide from depots in Manchester, Carlisle and London.
A survey identified an Asbestos Insulating Board (AIB) ceiling at this domestic property in Carlisle. The licensed asbestos removal works were awarded for the removal and disposal of approximately 20m² of AIB ceiling under fully controlled conditions in accordance with the Control of Asbestos Regulations 2012, HSG247 and current industry best practice, with the works notified to the HSE ahead of commencement. The works were undertaken within a fully enclosed negative pressure enclosure with airlock and baglock decontamination procedures by trained and competent licensed asbestos personnel.
As the property is within a residential area, access and waste transit routes were carefully managed and monitored throughout to ensure the safety of the occupants, neighbours and members of the public.
The asbestos risks associated with the removal of the AIB ceiling were controlled through the use of a fully enclosed negative pressure enclosure, controlled wet removal techniques, Class H vacuum cleaners and strict decontamination procedures in accordance with the Control of Asbestos Regulations 2012 and HSG247. Air monitoring was undertaken throughout the works, and the enclosure was only dismantled following a satisfactory independent four-stage clearance and issue of the certificate of reoccupation. Non-asbestos risks were controlled through effective segregation, signage, good housekeeping and supervision throughout the project.
All asbestos waste was double-bagged, removed via the baglock and disposed of at a licensed hazardous waste facility with full consignment paperwork.