info@innov8-group.co.uk Ring us: 0333 335 6375
Not sure which service you need? Ask us, it's free
REQUEST A CALL BACK
innov8 Group
01About 02Services 03Costs 04Projects 05News 06Locations 07Contact INSTANT QUOTE
Sealed sample bags containing fragments of different asbestos-containing building materials on a dark workbench
← All FAQs
FAQS · NON-LICENSED MATERIALS

Are asbestos floor tiles dangerous?.

Thermoplastic and vinyl floor tiles laid from the 1950s to the early 1980s commonly contain chrysotile asbestos, and the black bitumen adhesive that bonded them down very often does too. They turn up in homes, schools, shops, offices and hospitals — frequently hidden under later carpet or laminate.
Like asbestos cement, tiles are a bonded, lower-risk material: the fibres are locked into the tile and the risk arises when they are smashed, sanded or ground off.
Written by the Innov8 UK Group asbestos team · Technically reviewed by our Contracts Director · Last reviewed July 2026
REQUEST A FREE QUOTE CALL 0333 335 6375

How to recognise and confirm them

Suspect tiles are typically 9-inch squares in mottled or marbled colours, brittle with age, over a black adhesive residue. But appearance is never proof — a sample of tile and adhesive tested at a laboratory settles it within a day or two. Always test before floor preparation, screeding or grinding work.

Removal done properly

Removal of asbestos floor tiles is normally non-licensed work. Tiles are lifted whole where possible using hand scrapers and low-heat techniques, kept damp, and double-bagged as asbestos waste. The critical rule is never to sand, grind or shot-blast the adhesive — that is what turns a low-risk floor into an airborne fibre problem. Residual bitumen is either removed with controlled methods or encapsulated beneath the new floor build-up.
On commercial projects we often carry out reassurance air testing during and after works.

Can they stay in place?

Yes — sound tiles that will sit under a new floor finish can often be encapsulated and left, recorded in the asbestos register. That is frequently the most proportionate answer for occupied buildings. The decision should follow a survey or assessment rather than habit either way.

Flooring contractors take note

If you are a flooring or refurbishment contractor and you hit black adhesive on a pre-1985 floor, stop and get it tested before any mechanical preparation. We provide fast sampling and, where needed, removal that keeps your programme moving.
Need this dealt with?
Explore our Sampling & testing service, or send a photo of the material via WhatsApp for a free identification and fixed quote.
SOURCES & GUIDANCE
This guidance reflects: HSE — Asbestos health & safety  ·  The Control of Asbestos Regulations 2012. Every property and material differs — contact us for advice on your specific project.
RELATED QUESTIONS
How does asbestos testing work and how fast are results?Read the answer → What is notifiable non-licensed work (NNLW)?Read the answer → How is asbestos waste disposed of legally?Read the answer →
Innov8 Group
HSE-licensed asbestos removal and environmental contractor. Surveys, removal, demolition, remediation and hazardous waste — one team, one responsibility. North West based, working UK-wide.
Follow us on social media
PAGES
About usServicesCostsProjectsNewsLocationsAccreditationsFAQsSurvey analyserContact
SECTORS
HomeownersLandlordsHousing associationsSchoolsHealthcareMain contractorsIndustrialRetail & officesPublic sectorDevelopers & land remediation
CONTACT
0333 335 6375 info@innov8-group.co.uk Unit 7, Wilsons Business Park Centre, Manchester M40 8WN
website by pixelmonster
5-star rated by our customers
5-star rated on Trustpilot reviews
5-star rated on Yell business reviews
Verified reviews across the web
Trustindex© 2026 Innov8 UK Group Ltd. All rights reserved.  ·  Privacy  ·  Cookies
website by pixelmonster