Who carries out a 4-stage clearance?
An independent UKAS-accredited asbestos analyst, working to HSE's Analysts' Guide (HSG248). They are appointed separately from the removal contractor so their pass or fail is impartial.
Can the removal contractor do their own clearance?
No. Independence is the point — the analyst answers to the client and the regulations, not the contractor. A contractor offering to "self-clear" a licensed enclosure is a serious red flag.
What happens if a stage fails?
The enclosure is re-cleaned and the failed stage repeated until it passes. At a good contractor that re-clean and re-test is at the contractor's cost, not yours — another reason enclosures should be built to pass first time.
Do non-licensed jobs need a 4-stage clearance?
No — 4SC applies to licensed enclosure work. For non-licensed jobs a thorough visual inspection is standard, and reassurance air testing is available and often sensible in occupied buildings.
How long does a clearance take?
Typically a few hours to a full day depending on enclosure size and complexity — it is programmed into the job, not bolted on at the end.